Toronto · Yorkville · Yonge & Bloor
One Bloor West
Canada’s first supertall, at the city’s finest corner.
85 storeys, 308.6 m, designed by Foster + Partners — at Yonge & Bloor, on the edge of Yorkville. A five-star hotel is planned in the tower; no hotel operator has been named.
One address, above everything.
The tallest residential building in Canada, and the first over 300 metres. Seven facts, each verified.
What we know — and what we don’t yet.
Pricing has not been released. No price list, starting price or deposit structure has been published for One Bloor West. This page registers interest for buyers considering $2M+ residences — that is a buyer profile, not a published price.
One Bloor West began as “The One” under a previous developer, which is no longer involved. The tower is Canada’s tallest residential building and its first over 300 m.
No hotel operator has been named for the tower. Until one is named, no hotel brand, service or amenity claim can be made for this tower — and this page makes none.
No suite mix, floor plans, unit count or amenity list has been published, so none appears here. The dated milestones on this page — interim occupancy Spring 2027 and completion early 2028 — come from the project’s published timeline.
Yonge & Bloor — one of Toronto’s best corners.
Two subway lines under the corner. Canada’s priciest shopping street at the doorstep. The highest condo prices per square foot in the city. A university a ten-minute walk away. That is the case for this corner — the facts are below, each with its source.
Sources: TTC / Wikipedia, Bloor-Yonge station (2023–24 ridership); my-toronto.ca, Toronto’s Mink Mile; valery.ca, Yorkville guide (updated Nov 25, 2026); uhomes.com (U of T distance).
Two subway lines under the corner.
- Bloor-Yonge station sits directly under the intersection — Line 1 Yonge–University and Line 2 Bloor–Danforth. It is the busiest station on the TTC, with about 278,000 riders a day (2023–24), and the TTC is spending $1.5 billion expanding it — a new Line 2 platform and wider Line 1 platforms, with major construction planned from 2027.
- Line 1 south runs straight down Yonge: five stops to King Street in the financial district, six stops — about 8 minutes — to Union Station.
- Line 2 east–west runs under Bloor Street from Kipling in Etobicoke to Kennedy in Scarborough — 31 stations across the whole city.
- Harbourfront & the CN Tower: Line 1 south to Union, then the 509 Harbourfront and 510 Spadina streetcars to Queens Quay, Harbourfront Centre and the ferry terminal. The CN Tower, Rogers Centre and Ripley’s Aquarium are a short walk from Union — about 4 km from the corner, 8 minutes by subway.
- The museums: one stop west on Line 2 to St George, then one stop south to Museum station for the Royal Ontario Museum. The Royal Ontario Museum is also about a 15-minute walk west along Bloor.
- The airport: UP Express from Union Station to Pearson Airport in 28 minutes.
Sources: TTC, Bloor-Yonge Station Capacity Improvements; Wikipedia, Bloor-Yonge station; rome2rio.com, Bloor-Yonge Station to CN Tower; torontolivemap.ca, Toronto subway map 2026; canada-spirit.com, Getting Around Toronto; mapa-metro.com.
A campus corner.
The Toronto Reference Library — 789 Yonge Street — is about a 5-minute walk north. Walking and transit times are approximate, from the Yonge & Bloor corner.
Sources: uhomes.com, 1 Bloor Street East (distances from the same corner); yorkvillemanor.com; colivease.ca, Best Toronto Neighbourhoods for Students (2026 guide).
Downtown, the financial district & the waterfront.
- The financial district is five subway stops south — King Station (Yonge & King), in the financial district. The downtown core (Queen, Dundas, Eaton Centre) is three to four stops.
- Union Station is six stops, about 8 minutes: GO Transit and VIA Rail, the UP Express to Pearson, and the gateway to the waterfront.
- Harbourfront: from Union, the 509 and 510 streetcars run along Queens Quay to Harbourfront Centre, the ferry terminal to the Toronto Islands, and the Exhibition grounds.
- CN Tower, Rogers Centre and Ripley’s Aquarium sit around Front Street at Union — about 4 km from the corner, one subway ride away.
- Tourist Toronto runs on this same line: the ROM and the Museum district, the Eaton Centre, the Entertainment District at King West, and St. Lawrence Market — all on Line 1 south of Bloor-Yonge, no transfers needed.
Sources: torontolivemap.ca, Toronto subway map 2026; rome2rio.com, Bloor-Yonge Station to CN Tower; canada-spirit.com, Getting Around Toronto.
The priciest square footage in the city.
Yorkville carries the highest condo prices per square foot in Toronto. These are sold figures from MLS data, not asking prices — and no price has been published for One Bloor West itself. No Bloor-Street-only price series is published; Yorkville figures are the closest benchmark.
Yorkville condos, Q3 2026 — $1,314 / sq ft
Average sold price per square foot across Yorkville condo sales. Average sold price $1,457,358; 74 sales; 48 days on market.
Source: beintoronto.com, Yorkville Condo Sales Report, 3rd Quarter 2026 (MLS sold data).
Record sale — $2,944 / sq ft
A penthouse at 200 Cumberland sold for $15.25M in Q3 2026 — the highest $/sq ft ever paid for a Yorkville condo. In Q2, a penthouse at 181 Davenport sold for $15.495M, the highest resale condo price in Yorkville.
Source: beintoronto.com, Yorkville Condo Sales Reports, 2nd & 3rd Quarter 2026.
Yorkville median — $868,000
Median sold price across all home types, Nov 2025–Oct 2026 (134 sales), at $1,134/sq ft — the highest $/sq ft of all 143 Toronto neighbourhoods. Median asking price $1,070,000.
Source: valery.ca, Yorkville neighbourhood guide (updated Nov 25, 2026).
Broker range — $1,200–$1,600 / sq ft
Yorkville / Bloor-Yonge resale estimates, Nov 2026. The source itself labels these broker estimates — not a published statistic. Luxury resale commonly runs $1,250–$2,200+/sq ft, with ultra-luxury penthouses above $2,500/sq ft.
Source: whatisvalueofmycondo.com, Toronto Condo Price Per Square Foot 2026; urbanrealtytoronto.com, Yorkville Condos 2026 guide.
No price has been published for One Bloor West itself. Register below and Randy will send the current list when it is released — with the deposit structure and the hotel operator, when each is announced.
What’s happening around the corner.
- The subway station is being rebuilt for growth. The TTC’s $1.5-billion Bloor-Yonge capacity expansion — a new Line 2 platform, wider Line 1 platforms, bigger concourse and entrances — has major construction planned from 2027. The busiest station in the system is being built for more riders, not fewer.
- The Mink Mile keeps setting the pace. Bloor Street between Yonge and Avenue Road is Canada’s priciest retail strip, with flagship stores for Chanel, Hermès, Louis Vuitton, Tiffany & Co., Prada, Rolex and Holt Renfrew at the doorstep. The wider Bloor-Yorkville district counts roughly 700 designer boutiques and more than 1,200 businesses.
- Yorkville’s luxury market is moving. Two record penthouse sales in 2026 — $15.495M at 181 Davenport and $15.25M at 200 Cumberland — and 74 condo sales in the third quarter alone, at an average of $1,314 per square foot.
- New neighbours keep arriving. Recent Yorkville towers a block or two away include 11 Yorkville (65 storeys) and 1 Yorkville (58 storeys), and Eight Cumberland at Yonge & Cumberland (64 storeys, 531 units) is part of the same wave.
Sources: TTC, Bloor-Yonge Station Capacity Improvements; my-toronto.ca / wtftoronto.com, the Mink Mile; booking.torontoboutiqueapartments.com, Yorkville guide; beintoronto.com, Q2 & Q3 2026 Yorkville sales reports; Bisnow, 5 Projects Giving Yorkville a Fresh New Look (updated Jul 27, 2026); heapsestrin.com, 11 Yorkville listing.
Register interest — $2M+ residences.
Registering puts you first in line for Randy’s call when pricing is released and a hotel operator is named. Answer the questions below so the follow-up speaks to what you actually want.
Or message Randy directly: WhatsApp 647-931-5470 · randy@mail.strategicwealthpath.com
Questions, answered plainly.
Is One Bloor West a Fairmont Residences project?
No — not as far as anything verified shows. No hotel operator has been named for the tower. Until one is announced, no hotel brand can be attached to it.
Has pricing been released?
No. No price list, starting price or deposit structure has been published. This page registers interest for buyers considering $2M+ residences — a buyer profile, not a published price.
When will it be finished?
The project’s published timeline gives interim occupancy in Spring 2027 and full completion in early 2028.
How do I register for updates?
Use the form above or message Randy on WhatsApp at 647-931-5470.
Who is marketing this page?
Randy Ramadhin, Broker, Century 21 People’s Choice Realty Inc., Brokerage, as Condoinvest.ca. This page is not affiliated with or endorsed by the developer, and it is not the developer’s official project page.
